ANALISIS KEEKONOMIAN PROYEK KERJA ULANG (WORKOVER) SUMUR X LAPANGAN XD MENGGUNAKAN METODE PSC (PRODUCTION SHARING CONTRACT)
Abstract
Well X in the XD Field is a natural gas production well located in the XD field, South Sumatra, which is experiencing a decline in production caused by excess water production at a flow rate of 4 MMscfd and then repairs are carried out through rework, namely squeeze cementing. With the aim of the well producing gas optimally again. In a gas production volume of 1,095 Mmscf for 1 year of production from the “X” well, the result s of the calcu1ation of economic indicators at the time of planning on gas prices 5 USD/MMBTU obtained a net present value of 807 M US $, an internal rate of return of 379% and a payout time of 0.20 years based on the PSC (Production Sharing Contract) model.
Keywords
Full Text:
PDFReferences
Abror, M. M., & Kusrini, D. (2019). Analisa Perhitungan Keekonomian Lapangan “X” West Java Basin Menggunakan Metode PSC (Production Sharing Contract). Jurnal Migasian, 3(2), 1-7.
Anjani, B. R., & Baihaqi, I. (2018). Comparative analysis of financial Production Sharing Contract (PSC) cost recovery with PSC gross split: Case study in one of the contractor SKK Migas. Journal of Administrative and Business Studies, 4(2), 65-80.
Lingard, N., Morgan, P., Apostolova, K., & Tan, J. (2020). Cost recovery in production sharing contracts: a comparative review of Southeast Asian jurisdictions. The Journal of World Energy Law & Business, 13(5-6), 441-456.
Lubiantara, B. (2017). Paradigma baru pengelolaan sektor hulu migas dan ketahanan energi. Grasindo.
Nandasari, P., & Priadythama, I. (2016). Analisis Keekonomian Proyek Perusahaan Minyak Dan Gas Bumi: Studi Kasus ABC Oil. Teknik Industri Universitas Sebelas Maret.
Priambodo, A., Julianto, C., Nugroho, M. R., & Tulloh, H. (2020). Studi Perencanaan dan Pelaksanaan Squeeze Cementing Metode Bradenhead Squeeze untuk Water Shut Off pada Sumur Minyak dengan Water Cut Tinggi. In Prosiding Seminar Nasional Sains dan Teknologi Terapan (Vol. 1, No. 1, pp. 403-410).
Rahayu, S. A. P. (2017). Prinsip hukum dalam kontrak kerjasama kegiatan usaha hulu minyak dan gas bumi. Yuridika, 32(2), 336-354.
Rivaldi, A. (2023). EVALUASI KEEKONOMIAN PADA LAPANGAN Y MENGGUNAKAN MODEL KONTRAK PRODUCTION SHARING CONTRACT COST RECOVERY (PSC CR) DAN PRODUCTION SHARING CONTRACT GROSS SPLIT (PSC GS) (Doctoral dissertation, Institut Teknologi Sains Bandung).
Samban, F. G. (2021). Analisa keekonomian projek kerja ulang (workover) sumur “KD-01” lapisan “N-81 & N-82” (Tugas akhir). STT MIGAS Balikpapan.
SKK Migas. (2017). Pedoman Tata Kerja Nomor PTK-063/SKKMA0000/2017/SO tentang Financial Budget and Reporting Manual of Production Sharing Contract dan chart of Account.
Soesanto, E., Agusman, A. R., Nasution, M. M., & Fadhillah, S. (2023). Kebijakan Pemerintah Dalam Penentuan Kontrak Gross Split Sektor Minyak Dan Gas Di Indonesia. Jurnal Bhara Petro Energi, 8-14.
Sundari, A., & Muryanto, Y. T. (2020). Penerapan Asas Itikad Baik Terhadap Kontrak Bagi Hasil Dengan Sistem Cost Recovery Dan Gross Split. Jurnal Privat Law, 8(1), 49-56.
Taufiq, A. F. (2022). Pemberian insentif pajak kepada investor di industri minyak dan gas bumi dalam sektor eksplorasi. Journal Nasional Pengelolaan Energy Migas Zoom, 4(1).
DOI: https://doi.org/10.58267/petrogas.v8i1.206
Refbacks
- There are currently no refbacks.




