MEMPREDIKSI KEADAAN SUMUR DIMASA DEPAN DENGAN MELAKUKAN OPTIMASI MENGGUNAKAN ELECTRICAL SUBMERSIBLE PUMP PADA SUMUR “AD-96”
Abstract
Keywords
Full Text:
PDFReferences
Brown, K. E. (1977). The Technology of Artificial Lif. Company 1421 S. Sheridan Tulsa.
Brown, K. E. (1984). Artficial Lift Methods Kermit Brown vol 4.pdf. Company 1421 S. Sheridan Tulsa.
Musnal, A. (2014). Perhitungan Laju Aliran Fluida Kritis Untuk Mempertahankan Tekanan Reservoir Pada Sumur Ratu Di Lapangan Kinantan. Journal of Earth Energy Engineering, 3(1), 1–8. https://doi.org/10.22549/jeee.v3i1.934
Pertamina. (2003). Sistem Pengangkatan Buatan In Perencanaan dan Troubleshooting (ESP) (Vol. 31). Pertamina.
Ramadhani, A. A., Anwar, U., & Herlina, W. (2018). Evaluasi Ukuran Diameter Tubing Untuk Upaya Optimasi Laju Produksi Sumur a-28 Lapangan B PT. Pertamina Ep Asset 2 Pendopo Field. JP Vol.2 No. 2 Mei 2018 ISSN 2549-1008, 2(2), 1–10.
Schlumberger. (2007). Reda Electric Submersible Pump Technology, Esp Catalog. 548.
Wiggins, M. L. (1994). Generalized inflow performance relationships for three-phase flow. SPE Reservoir Engineering (Society of Petroleum Engineers), 9(3), 181–182. https://doi.org/10.2118/25458-pa
DOI: https://doi.org/10.58267/petrogas.v3i1.47
Refbacks
- There are currently no refbacks.