PERENCANAAN SQUEEZE CEMENTING JOB PADA SUMUR “RF-L”, LAPANGAN “D” DENGAN MENGGUNAKAN METODE BALANCE PLUG

Ripal Rombe, Rohima Sera Afifah, Muhammad Nur Mukmin, Aris Luqman Tryana, Nijusiho Manik, Rizky Kurniawan

Abstract


This research aims to design a squeeze squeeze cementing job for well “RF-L” in field “D” using the balance plug method to isolate the MFS-8 formation layer, which has shown a decline in productivity and an increase in water production. The research method using the balance plug technique . The calculations were based on casing, tubing, perforation, and reservoir pressure data. The results indicate that the squeeze cementing operation requires 46 sacks of Class G cement with a total slurry  volume of 9.402 bbl and 5.5 bbl of mixing water. The volume of spacer ahead was 12.81 bbl and spacer behind was 1.09 bbl, while the displacement fluid volume was 4.5 bbl (after subtracting 1 bbl of underdisplacement). Reverse circulation of 5.2 bbl was performed to clean residual slurry  from the tubing. Hesitation and Waiting on Cement (WOC) were applied to ensure the cement hardened properly in the target zone without damaging the formation


Keywords


Squeeze Cementing, Balance Plug, Spacer, Slurry, Displacement, spacer, hesistation

Full Text:

PDF

References


Alkhamis, M., & Imqam, A. (2021). Sealant injectivity through void space conduits to assess remediation of well cement failure. Journal of Petroleum Exploration and Production Technology, 11(6), 2791-2804.

Azis, M. R., & Effendi, D. (2024, January). Perhitungan Material Slurry Dan Desain Cement Slurry Di Laboratorium Pada Semen Pemboran Kelas G. In Prosiding TAU SNARS-TEK Seminar Nasional Rekayasa dan Teknologi (Vol. 3, No. 1, pp. 83-89).

Bahrami, E., Farazmand, R., Norouzi-Apourvari, S., Rashidi, M., Hemmati-Sarapardeh, A., & Ostadhassan, M. (2024). Effect of particle size distribution on the class G oil well cement properties: experimental measurement and intelligent modelling. Geoenergy Science and Engineering, 240, 213030.

Costa, B. L. S., Freitas, J. C. O., Araujo, R. G. S., Oliveira, Y. H., Santiago, R. C., & Oliveira, F. S. (2021). Analysis of different oil well cement slurry formulations exposed to a CO2-rich environment. Journal of CO2 Utilization, 51, 101636.

Fuller, G. A., Mercado, S., & Mead, C. (2016, March). Engineered solutions to address deepwater remedial squeeze cementing challenges. In SPE/IADC Drilling Conference and Exhibition (p. D031S025R001). SPE.

Ibrahim, S., Fatryanto, D., Wicaksono, B., & Lutfi, M. (2023). Squeeze Cementing Design Based on Technical Calculations of Wells “S” and “I” in the “XY” Field. AL-MIKRAJ Jurnal Studi Islam dan Humaniora (E-ISSN 2745-4584), 3(2), 241-250.

Ikhsan, A., & Nirmala, G. S. (2024). Evaluasi Program Squeeze squeeze cementing Di Sumur X Pada Lapangan Pertamina Ep Zona 7 Jatibarang Cirebon. Jurnal Eksplorasi dan Produksi Migas, 2(2), 74-82.

Izadi, M., Trudel, E., & Frigaard, I. A. (2024). Risk-based analysis of squeeze cementing operations. Geoenergy Science and Engineering, 234, 212687.

Lauma, A. C., Djumantara, M., & Pauhesti, P. (2023). Analisis desain squeeze squeeze cementing pada sumur apr-04. J. Penelit. Dan Karya Ilm. Lemb. Penelit. Univ. Trisakti, 8, 215-220.

Liu, R., Li, Y., Du, T., Zhou, S., Lu, P., & Wang, Y. (2022). Insight into Class G Wellbore Cement Hydration and Mechanism at 150° C Using Molecular Dynamics. Energies, 15(16), 6045.

Prasetyo, E., Arief, T., & Prabu, U. A. (2019). Perencanaan Squeeze squeeze cementing Metode Balance Plug Pada Sumur X dan Sumur Y di Lapangan Ogan PT. Pertamina EP Asset 2 Prabumulih. Universitas Sriwijaya.

Prasetyo, W., & Yunita, L. (2025). SQUEEZE CEMENTING PLANNING USING BALANCE PLUG METHOD IN LOSS FORMATION ON “TBN-10”. KURVATEK, 10(2).

Priambodo, A., Julianto, C., Nugroho, M. R., & Tulloh, H. (2020, September). Studi Perencanaan dan Pelaksanaan Squeeze squeeze cementing Metode Bradenhead Squeeze untuk Water Shut Off pada Sumur Minyak dengan Water Cut Tinggi. In Prosiding Seminar Nasional Sains dan Teknologi Terapan (Vol. 1, No. 1, pp. 403-410).

Resesiyanto, H. (2022). Perhitungan Kebutuhan Material Penyemenan Dengan Metode Balance Plug Pada Program Cement Plug Sumur X Lapangan Y. INTAN Jurnal Penelitian Tambang, 1(1), 38-43.

Yang, M., Luo, H., Xie, R., Wu, P., Yang, M., Yang, L., & Xue, H. (2022). Estimating and optimizing wellbore pressure during primary cementing in low pressure and leakage formations. Journal of Petroleum Science and Engineering, 208, 109236.




DOI: https://doi.org/10.58267/petrogas.v8i1.207

Refbacks

  • There are currently no refbacks.